Thursday, April 30, 2015

Maersk Placentia - sold on


 Maersk Placentia with water cannon on bow.

Another of the former Husky-Bow Valley tug/suppliers has been sold. This time it is Maersk Placentia, built by Bel-Aire Shipyard in North Vancouver in 1983 as Placentia Bay, it went to Maersk Canada in 1997 along with its five sister vessels. Initially named Maersk Placentia, it was renamed Maersk Shipper in 1990, reverting to Maersk Placentia in 1997.

 
Placentia Bay and Nordertor securing the jack-up rig Rowan Gorilla I thirty years ago...


It arrived in Halifax for the first time June 23, 1983 with Bonavista Bay (which was sold in 2007, becoming Drive Bonavista). Under Maersk ownership it has been based out of St.John's NL. It was also fitted with a bow mounted water cannon for deflecting ice floes.

Its Canadian register was closed April 23, 2015 and it has since been renamed Storm Express. Details of the new owner have not yet emerged, but the vessel is still in St.John's.

.

Saturday, April 25, 2015

Jim Kilabuk - heading west (again)



The veteran tug/supplier Jim Kilabuk at pier 9c thins morning. The berth should be a familiar one to the vessel that has worked out of Halifax off an on since its first arrival in these waters almost twenty years ago.

The proverbial painted ship upon a painted sea, arrived this morning.

Built by Yarrows Ltd in Esquimalt in 1975, for Canadian Marine Drilling it was orginally named Canmar Supplier IV. Canmar was a subsidiary of Dome Petroleum, a company that had invested heavily in Beaufort Sea offshore oil, and the tug/supplier was one of several built to work in the western arctic area. It is powered by a pair of GM engines totaling 7200 bhp, giving it a bollard pull of 90 tonnes, and is purpose built for harsh weather.
When Dome got in to financial trouble the company was sold to Amoco Canada in 1987. However oil work in the Beaufort came to an end and in 1995 the tug was sold to Northern Transportation of Hay River, AB.The company was known for its Mackenzie River barging operations and coastal work in the arctic.

Already twenty years old, and apparently laid up for some time, the tug was placed under the Trinidad + Tobago flag and was first renamed Holly B.(unofficially), then Pernell J. It arrived in Halifax May 11, 1995, and while refitting at Dartmouth Marine Slips was renamed Jim Kilabuk, and returned to the Canadian flag. 

Since then the vessel worked on the charter market for offshore work and general towing. It has also returned to the western arctic via Panama least once (in 2006). However work has been hard to find in recent years, and the boat was laid up in Newfoundland for the last two years.

A sister tug Alex Gordon (ex La Marr J, Hazel Ward, Canmar Supplier III) remains laid up in Newfoundland.

The future Jim Kilabuk arriving in Halifax May 11, 1995 as Pernell J.
.

Wednesday, April 22, 2015

Russians towing Canadians - Part 2

For a Canadian warship, the ultimate indignity, as I called it in Shipfax, was to be towed to the scrap yard  by a Russian tug. The Canadian navy (as with all NATO navies) played "cat and mouse" with the USSR for years during the cold war, but it was all in earnest, as the expectation of real war was never very far over the horizon.

During that time there was also a large communist bloc presence of fishing vessels from the USSR, Poland, East Germany, and even Bulgaria and Romania off Nova Scotia and Newfoundland. They were always near when there was any naval activity and invariably a trawler or a rescue tug or even a research ship showed up in Halifax when there were visiting naval ships from other NATO countries. See Tugfax for photos of USSR rescue tugs here: http://tugfaxblogspotcom.blogspot.ca/2012/10/ussr-rescue-tugs.html and http://tugfaxblogspotcom.blogspot.ca/2012/10/more-ussr-rescue-tugs.html
 
When the USSR was broken up the threat seemed to vanish overnight and Russian (former USSR) ships began to appear under different conditions. As I showed in Part 1, they showed up to tow old ships to the scrappers, and seemingly had their fair share of former naval ships.

 
The harbour tug Point Halifax arrives off pier 9B to assist Purga with ex HMCS Skeena.
 
Purga eases off the pier. It was built in 1974 by Okean shipyard in Oktyabrskoye, and is still operating out of Murmansk.

The tug was carrying two Yokohama fenders on deck, which would be used if the tug had to come alongside the tow.





A small riding crew were on the Skeena only to let go the mooring lines. They disembarked soon after the tow got underway for India July 3, 1996.

Once off the pier, the tow had to turn in the Narrows to head outbound for sea. Harbour tug Point Chebucto assisted in the turn.


.

Russians towing Canadians - Part 1

The subject of decommissioned warships has been a topic on Shipfax recently. The unfortunate reality is that these ships eventually need to be disposed of. Most of the Canadian warshsips decommissioned from the east coast of Canada have been towed overseas for scrap.

The tugs that have towed these ships, ironically, have included Russian - the old foes from the cold war days.

Assiniboine leaving Halifax November 25, 1995 in tow of Kaliningradets.

Kaliningradets is one of a large fleet of similar tugs. It was built in 1984 by the Yaroslavskiy shipyard and is still in service.

Assiniboine and Kaliningradets were reported in Durban February 7, 1986 en route to India.


Sapfir, built in 1988 was of the same class. It is getting underway from pier 9 (that is the fantail of Ryan Leet in the foreground). It had been operating under the Ukraine flag since 1992 for Marine Rescue Service Mars and is till in use.

Its tow was ex HMCS Ottawa, leaving Halifax April 4, 1994 and arriving in Alang, India August 15.




On March 13, 1994, the former HMCS Margaree left Halifax in tow.




The tow was assigned to icebreaker Afanasiy Nikitin, under the Ukrainian flag. Built as Ledokol-2 in 1962 by Admiralteiskiy-Werft in Leningrad.


The tug was in pretty raw shape itself, but made it to Cape Town about April 14 and Bombay about May 14. The tug itself was broken up in Alang May 28, 1995.

.

Saturday, April 18, 2015

May C - gets a spa treatrment


It is said that 75% or more of an iceberg is underwater and invisible. The percentage may not be as high with a tug, but there is generally more underwater than you would think. Such was the case today seeing the tug May C hauled out for a refit at Aecon Fabco in Pictou.


May C on the cradle at Pictou, with shaft drawn and prop and rudder removed, getting an underwater clean and paint.

The shipyard bought the tug in 2011 and have used it around their yard and in the Pictou area for a variety of chores.
A quick drydocking for a hull scrape and paint is often termed a "shave and a haircut" , but this refit appears to be more extensive (not to mention the indelicacy of such terms in the case of a female) - it is more of a makeover or at least an spa treatment. 
I have covered the tug several times before on this blog including:

http://tugfaxblogspotcom.blogspot.ca/2010/11/mary-steele.html

May C alongside the government wharf in Pictou last September.

.

Thursday, April 16, 2015

Svitzer Cartier sails




After completing trials, including a bollard pull test, Svitzer Cartier sailed this morning for the Verreault shipyard in Les Méchins, QC.


After a brief stint at the yard for underwater survey (usually a condition of any handover) and any other work that needs to be done by a shipyard, the tug will be ready to work at Port Cartier.

As a follow up to my previous posts, ArcelorMittal will continue to operate its own tugs Brochu and Vachon at Port Cartier, and Svitzer will operate Svitzer Cartier.

Svitzer also operates the tug Pointe-Comeau at Baie-Comeau, which was called in if needed at Port Cartier, but that will be less likely to happen now. The two ports are more than 100 miles apart, which required a lot of advance notice and planning, which will now be alleviated.



.

Sunday, April 12, 2015

Svitzer Cartier- what more can be said

Since a new tug is a rare thing in eastern Canada these days, perhpas I can be forgiven for making mention of the tug again!

 New tires on top of fenders, but can't somebody do something about those schooner anchors?

Some additional thoughts:

1. The news today that Algoma Central Marine has acquired the Panamax self-unloader Gypsum Integrity to run under Canadian flag as Algoma Integrity on the iron ore shuttle from Port-Cartier to Contrecouer, QC puts some more logic behind the move to add a third tug in Port-Cartier. That ship will be in and out of port weekly year round, ad due to its size  197m loa and 32.2m broad, it will certainly take two tugs to berth.

2. I notice the crew on Svitzer Cartier are all wearing bright shiny new Svitzer hard hats and coveralls. The skipper, when the tug came alongside yesterday after fueling, was very adept at handling the tug, and where would be get that experience? Obviously not a new hire, despite the fresh coveralls. I'm guessing Svitzer Canada has taken over management of the other tugs in Port-Cartier too. It would only make sense, since up until now the tugs have been managed by the iron ore company itself (now ArcelorMittal, but previously Quebec-Cartier), and why would they want a third tug under a different management arrangement?



3. All that raises the third supposition. With Svitzer on board, and access to a world wide network of tug operations, and faced with eventual replacement of the two incumbent tugs Brochu and Vachon, could we expect an announcement of some more new tugs soon?

The new Svitzer Cartier has two sister tugs recently "blacked" by Australian unions due to an asbestos scare, but my guess is that brand new tugs are more likely. Brochu and Vachon are reported to be in excellent condition, so there is no rush, but inevitably more powerful tugs are in the cards.

.

Saturday, April 11, 2015

Svitzer Cartier - another update



The protective box over the winch has been removed, revealing the massive Karmoy unit that will be used in ship berthing. The box turns out to have been more than just a shelter, it was also insulated and heated. This means that the winch itself was not designed for winter operation, and will have to be upgraded to survive normal operating conditions in Canada. All its piping and control are exposed on the port side, and will require some sort of permanent protection.


A portion of the temporary housing, which joined it to the permanent superstructure has not been removed yet.

The tug also took fuel today and made a short trials trip in the harbour.


But there is till lots of work to do to make the tug ready for service.

The towing staple, sheathed in stainless (?) steel, intended to protect expensive mooring lines from chafe, looks more than capable of shredding lines instead.

.

Thursday, April 9, 2015

Svitzer Cartier registered in Canada

The latest addition to Svitzer Canada's fleet , Svitzer Cartier was officially registered in Canada today. The port of registry is Halifax, where Svitzer's head office is located. A press release from Svitzer indicates that the tug will be at work in Port Cartier in mid-April.

 
Meanwhile the tug is fitting out at the Svitzer dock in Halifax, with paint touchups underway.


And the addition of tractor tires to the business end (the stern) of the tug.


Yet to come - the removal of the protective housing over the winch.


The housing proved useful in the ship's trip up from Panama, but since it blocks the view of the winch and towing staple, it won't be of much use when the tug goes to work. It appears to be bolted down to a frame on deck and is fitted with lifting hooks.

As an addendum to my first post on the tug, I now understand that it was "heavy-lifted" by ship from Shanghai to Balboa (ship not yet identified) where it was handed over to the specialty ship-delivery company TOS (Transport and Offshore Services).www.tos.nl


.

Wednesday, April 1, 2015

Lois M moves big barge, with a little help from a friend





With preparation work completed on the deck of the barge Nunavut Spirit, it was ready to move from pier 9B this afternoon. The tug Lois M that brought the barge in on March 27 still had its heavy towing connection in place.


In order to come alongside the barge, the harbour tug Atlantic Larch was called in to pull the barge's bow off the dock, allowing Lois M to slip in along the barge's starboard side.



After Lois M was secured, the two tugs moved the barge out into the stream and it became apparent why Lois M did not simply secure on the barge's port side. Two large structures project from the barge's hull, presumably part of a mooring arrangement, leaving  no room to get alongside.



Once turned, the barge was moved stern first to the Cherubini dock in Eisner's Cove, Eastern Passage. Cherubini Metal Works have built a number of components for the Hebron Gravity Base, and these will be loaded aboard using Cherubini's 500 tonne crane. Special fittings on the barge's deck will be used to secure the loads, which will be installed directly from the barge at Bull Arm, NL.

The Cherubini dock in Eisner's Cove was built to ship large steel fabrications, and since this photo was taken has been equipped with a large crane pad and 500 tonne crane.

Today's view of Cherubini, with Nunavut Spirit and Lois M alongside.