Maersk Cutter got underway this afternoon on a cable work mission. International Telecom chartered the ship from Maersk, but the cable work will be in Placentia Bay, NL for Eastlink, a cable TV, internet and cell phone service provider.
A pair of slides mounted over the stern roller were fitted for cable work. Not visible on deck due to the high gunwales is a container with the side cut out to store cable, and other gear for fibreoptic splicing. I am told that there is a complement of 47 persons aboard for the project.
Who's minding the store?
I had to wonder today who was looking after the drill ship Stena Icemax out in the Shelburne Basin, since all the suppliers that normally tend to it were in Halifax. Several days of bad weather - mostly high winds - may be the answer to why the boats were all in Halifax.
Skandi Flora got away from pier C, swapping places with....
Breaux Tide, which joined sister Jones Tide at pier 9C.
Also at pier 9C Atlantic Tern did some trials in Bedford Basin then returned to the pier.
Moving from pier 36 to pier 9 was Kaliutik and its barge Kaligak.
The barge is now loaded with two large steel fabrications for the McInnis cement project in Port Daniel, QC. The castings are independently supported on the deck of the barge with steel pedestals, but a highway trailer is run under them to allow for drive off when it reaches its destination.
The barge's name is spelled out as kaLIgak. Note the two wheel ramps secured to the deck in the foreground. They are still packed with sand from the last beach landing.
I imagine they are also waiting out the weather for a few days before embarking on the trip.
Interestingly the Kaliutik's AIS signal states that its next port of call is Cornwall, ON. Perhaps not surprising since it s now working under the agency of McKeil Marine.
.
No comments:
Post a Comment