Friday, May 6, 2016

Small Tugs - Big Lift

A trio of small tug/workboats operated by RMI Marine were hard at work this afternoon hauling the barge Timberland. The barge is carrying two new bridge deck sections for the Angus L. Macdonald bridge from the fabricator's yard to the bridge site.


The workboat/launch Captain Jim was in the lead towing Belle D which was in turn towing the barge.





Halifax Tugger was bringing up the rear with some pushing power.




At the bridge, the barge will be anchored in position (they are now working over the deep water channel) and the new sections will be hoisted up into place. The old section will be lowered to another barge, Océan Abyss.

.

No comments:

Post a Comment