Showing posts with label Maersk Nexus. Show all posts
Showing posts with label Maersk Nexus. Show all posts

Sunday, February 5, 2017

Feast or Famine in the Offshore and more on Bollard Pull

After an active year or two for offshore supply vessels, Halifax has now entered another drought, which shows little sign of improvement in the near term. As with the rest of the world, oil exploration and development has hit the skids and huge numbers of support vessels and drill rigs have been stacked. Halifax was a bit of an anomaly due to Shell's exploration drilling off Nova Scotia using the drill ship Stena ICEMAX.

However that troubled program turned up disappointing results on top of all the difficulties and the drill ship has moved on to its next assignment. (It is currently anchored in Las Palmas). The three suppliers used to support it are all now idled in Halifax.



Skandi Flora and Maersk Nexus are tied up at the IEL and Mobil docks in Dartmouth, and Scotian Sea at the old Coast Guard  base (see Shipfax January 30). The standby boat Atlantic Tern is idled at pier 9C also. There are no prospects in the offing unless Shell is forced to pick up the abandoned drill stem it dropped on the ocean floor a year ago.

BP also has plans for an exploration program in 2017, but details are scarce. In view of the world situation for this type of vessel, they may be laid up for some time.

Meanwhile both offshore gas facilities are experiencing problems.  Encana's Deep Panuke is winding down  to seasonal operation due to low process and water issues, but the supplier Atlantic Condor and standby Atlantic Tern remain employed..

The other Sable Island area gas project,  the Sable Offshore Energy Project (SOEP) (Exxon Mobil are the lead operators) has Venture Sea and Siem Hanne contracted. The project began production in 2013 but is not expected to last out its projected 13 year lifespan. The supplier Trinity Sea has been laid up in Dartmouth for several months.



Meanwhile at Halifax Shipyard the two newbuilding suppliers Atlantic Griffon and Atlantic Shrike have completed their first sea trials and bollard pull*tests. They continue fitting out at pier 9B, still in the hands of Damen, their builders. No date has been announced for handover to Atlantic Towing Ltd, but I am told that the third of the four tug order is en route to Damen's home shipyard in the Netherlands for its final trials.


There have been slow downs like this in the past as the oil industry is notorious for hills and valleys, but the current depressed market has seen numerous business failures and restructurings and still shows only faint glimmers of any sort of recovery.

Just astern of the new suppliers in the photo above, the cable ship Isaac Newton is in layup. Its operators, Dredging and Maritime Management SA (DMM SA) have applied for another coasting license for 2017. Apparently the ship did not complete its work on the New Brunswick / Prince Edward Island power cable project before the onset of winter. It is expected to resume work March 15 and complete by June 15.

* Bollard Pull
For many years bollard pull trials were conducted in Halifax off  the end of Pier 22 where there is a large, deeply rooted bollard, known as the "Queen Mary Bollard". There is one of these huge concrete filled steel bollards at each end of the seawall, at Pier 20 and Pier 22. They were installed when the seawall was built to accommodate the largest ships of the time, which was pre- Queen Mary, but that name has been used for many years. I probably have some more recent or clearer photos of the bollards,  but due to present day security restrictions I can't get near enough to take any pictures now.

The Pier 20 bollard at the north end of the seawall looked like this in 1970:


The bunkering tanker Imperial Cornwall is delivering some Bunker C fuel to the Nova Scotia Light + Power generating station (now the Nova Scotia Power Corp head office) and the Pier 20 Queen Mary Bollard sit in the foreground. It is large, deeply set in and surrounded by a working area.  





The water is deeper and there is lots of sea room off the end of Pier 23.


The south Queen Mary bollard is directly above the wheelhouse of the Canada Pilot No.4 as it speeds into port. The Italian passenger liner Leonardo DaVinci is making its approach to pier 21- mid-berth on the seawall.  A Russian trawler occupies the south end of pier 22 and another ship is tied up at pier 20 in the background.

Numerous Georgetown-built tugs conducted their bollard pull trials off pier 22.

Atlantic Bear at full power off Pier 22. The tow line has been sheathed where it might chafe on the stern rail.

OcĂ©an Raymond Lemay is set off diagonally from the corner of Pier 22 to prevent prop backwash from effecting the trial results. A fender is being swept away from the pier by the wash.  

Pier 22 is not accessible to vehicles, so it is more convenient to conduct trials off the end of pier 26. There is an equally large mushroom head bollard there, which would prevent the line from slipping off. I probably have a photo of it somewhere, but it is no longer accessible to unauthorized persons such as I.

Seven Seas Mariner glides in past the end of Pier 26. The yellow bollard is set back from the corner of the pier providing room for the load cell measuring device. (There is also a yellow railway bumper partially blocking the view.)
Here is a blow up:

  Yellow rail bumper, mushtoom bollard, light pole and fire hydrant occupy the end of the pier.
 .

Friday, December 2, 2016

Breaux Tide finished

It appears that the supplier Breaux Tide is leaving Nova Scotia waters for another assignment. The boat was one of two Tidewater vessels engaged to support Shell's exploration program with the drill ship Stena IceMAX.
 
After DP trials in Bedford Basin, Breaux Tide returns to pier 9c.

Both received coasting licenses to allow the Vanuatu registered ships to take the Canadian flag on a non-duty paid basis and to work in Canadian waters. Management of the two was by Atlantic Towing Ltd (ATL), as bareboat charters. The Jones Tide did not complete its first year when it was stood down after Stena IceMAX had the drill stem drop to the seabed in March 2016.


Jones Tide outbound. Ten days later it was idled at the old Coast Guard base (in the background).

After sitting idle at the old Coast Guard base for the month of April 2016, it reverted to the Vanuatu flag and sailed on May 5, 2016. It is now working in Trinidad and Tobago.


Breaux Tide renewed its coasting license in August 2016 for another year, but last month it appears to have gone off charter, and has been idle at the old Coast Guard base in Dartmouth. It will be sailing today for an as yet undisclosed location.


As of June, Tidewater, the largest offshore vessel operators in the world, had 87 of its 181 boats stacked and that figure may be larger now. However they may have found work for a new vessel like Breaux Tide.

Delivered by Jiangsu Zhenjiang in March 2015, the 3,927 grt supplier arrived in Halifax in late August 2015 via Capetown and Port Gentil, Gabon and was registered in Halifax August 31.


 Stena IceMAX is entering a new phase as it is reported that the ship must now drill a horizontal offset after encountering a major fissure in its current well, Cheshire. Shell has also announced that it will not be drilling any more in the current program, which was for two wells with an option for more if results were positive. The first well, Monterrey Jack did not deliver satisfactory results, not to mention the huge dollar loss due to the drill riser problem.


Support for the drill program is now being provided by Skandi Flora  (bareboat chartered by Mathers) and Maersk Nexus which joined the program in August and did not need a coasting license, since it is a Canadian flag vessel, Scotian Sea (Secunda.) and Atlantic Tern (ATL) also appear to be doing standby duty. Thus Shell has spread their largess amongst all the players in the supplier business. However they were not without criticism, since almost all the crew members are from Newfoundland, and the work is offshore Nova Scotia. The reverse situation would not be tolerated long in Newfoundland!
.



Sunday, September 11, 2016

Maersk Nexus

The supplier Maersk Nexus has been working out of Halifax for the last few weeks,. Since Maersk Supply Service Canada's base is in Newfoundland Maersk suppliers are here rarely.


Today it took on fuel at pier 9 from the Wilson pipeline and when completed, backed up to pier 9c. Yesterday it loaded bulk cargo from Shaw resources trucks, indicating to me that it is supporting drilling, and thus must be working for Shell.

One of a pair built by Asenav in Chile, it and its sister Maersk Nomad are 10,445 bhp PSVs of the Ulstein UT 745 CDL class. It was delivered in 2010.


Before moving back to pier 9c, Maersk Nexus waited for the arrival of Skandi Flora which is supporting Shell's drilling program in the Shelburne Basin. Managed by Mathers, it and Breaux Tide, operated by Atlantic Towing, are working under coasting licenses as foreign ships. The licenses have now been extended for another year as Shell is about to start a second exploratory well.

.